JPL Technical Report Server

Launch vehicle selection and the implementation of the Soil Moisture Active Passive mission

Show simple item record

dc.contributor.author Sherman, Sarah
dc.contributor.author Waydo, Peter
dc.contributor.author Eremenko, Alexander
dc.date.accessioned 2017-07-26T16:24:23Z
dc.date.available 2017-07-26T16:24:23Z
dc.date.issued 2016-03-05
dc.identifier.citation 2016 IEEE Aerospace Conference, Big Sky, Montana, March 5-12, 2016 en_US
dc.identifier.clearanceno 16-0040
dc.identifier.uri http://hdl.handle.net/2014/45793
dc.description.abstract This paper will discuss the technical challenges of timing launch vehicle selection, physical environments, mass allocations, material selections, propulsion system performance, dynamic response, launch phase and mission planning, overall size and configuration, and their interfaces with the launch vehicle. en_US
dc.description.sponsorship NASA/JPL en_US
dc.language.iso en_US en_US
dc.publisher Pasadena, CA: Jet Propulsion Laboratory, National Aeronautics and Space Administration, 2016 en_US
dc.subject SMAP en_US
dc.title Launch vehicle selection and the implementation of the Soil Moisture Active Passive mission en_US
dc.type Presentation en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search


Browse

My Account