Abstract:
In global geodetic solutions vertical rates of site motion are usually estimated relative to the geocenter (center of figure) of the solid earth. The velocity of the geocenter is estimated assuming that the plates are rigid, that the velocities of the plates equal those in NUVEL-1A (DeMets et al. 1990, 1994) and that the uplift, subsidence, and intraplate deformation due to glacial isostatic adjustment is negligible.