Abstract:
In January of 2004 both of the Mars Exploration Rover spacecraft landed safely, initiating daily surface operations at the Jet Propulsion Laboratory for what was anticipated to be approximately three months of mobile exploration. The longevity of this mission, still ongoing after ten years, has provided not only a tremendous return of scientific data but also the opportunity to refine and improve the methodology by which robotic Mars surface missions are commanded. Since the landing of the Mars Science Laboratory spacecraft in August of 2012, this methodology has been successfully applied to operate a Martian rover which is both similar to, and quite different from, its predecessors. For MER and MSL, daily uplink operations can be most broadly viewed as converting the combined interests of both the science and engineering teams into a spacecraft-safe set of transmittable command files. In order to accomplish these ends a discrete set of mission-critical software tools were developed which not only allowed for conformation to established JPL standards and practices but also enabled innovative technologies specific to each mission. Although these primary programs provided the requisite capabilities for meeting the high-level goals of each distinct phase of the uplink process, there was little in the way of secondary software to support the smooth flow of data from one phase to the next. In order to address this shortcoming a suite of small software tools was developed to aid in phase transitions, as well as to automate some of the more laborious and error-prone aspects of uplink operations. This paper describes the evolution of this software suite, from its initial attempts to merely shorten the duration of the operator's shift, to its current role as an indispensable tool enforcing workflow of the uplink operations process and agilely responding to the new and unexpected challenges of missions which can, and have, lasted many years longer than originally anticipated.